Gallery from the Toy Hospital
See some of our repair work
Snoopy needed a new nose,new ears,hole repairs,re-stuffing and cleaning.It took me 3 hours.
Mr.Kirby (gorillers nose) desperatly needed a new nose.It took 3 hours to complete from start to finish.
Army Ted had lost his leg and needed a new hip replacement.It wasn't easy,as I had to reconstruct one from scratch.But he is as good as new now.It took me 2.5 hours.
This Cat beanbag was in need of new fur and new stuffing. This was a complete reconstruction, the only orignal piece used was his face, which I had touched up. This took me about 3 hours.
This Pink Bunny was attacked by a dog, it required facial reconstruction, and ears corrected. This was washed, and restuffed. This took 4 hours as it required to be handstitched.
My most challenging project todate was Frankenstein. At over 30 years old, you can see that there is not much left of his original features. Luckily evidence of his original colours were still present on some of the material. This took 9 hours to reconstruct from scratch, restuff and also apply new eyes.








